Mixed-Use

80 on the Commons

3 item(s) found.

Back Filter Results Clear All
Clear Filters
Intrepid_3362.jpg
Office/Corporate 06/08/2015
2016

1200 Intrepid

2016's Harry H. Edwards Industry Advancement Award winner proves that precast concrete enables the most innovative architectural designs while providing a highly energy-efficient and durable envelope. One of the most prominent features of the building is the white precast concrete façade, which dips dramatically away from the walkway along the eastern edge, then tips back out again, much like the buildings in a Dr. Seuss story. “One of the key design challenges was to create that curved façade from precast panels,” says David Bosch, engineering team leader for High Concrete Group. The curved load-bearing design was achieved by assembling flat, traditional precast concrete panels to form a complex faceted geometry. An interlocking structural system was embedded within the panels to eliminate the need for traditional precast concrete spandrel panels. “The resulting façade creates an aesthetic versatility that is unique to the project,” Bosch says.

View 1200 Intrepid
Marriott at Penn Square and Lancaster County Convention Center
Mixed-Use 07/06/2009

Lancaster County Convention Center

Big building, small space

Established in 1718, Lancaster is the oldest inland city in the United States. Its town square can be traced back to 1730 when James Hamilton laid the city out in a traditional grid. Structures with lasting, historical value have been fixtures on the square for years. The central area has always been among the most densely developed parts of the city.

Certainly, constructing an intricate project, Lancaster County Convention Center, that would bring new architecture to an established, compact downtown would require imagination and thoughtful planning. Knowing that precast could solve many of the potential issues, architectural firm Cooper Carry engaged High Concrete Group LLC from the earliest planning stages.

The biggest obstacle consisted of working around the existing structures, many of which would be integrated into the new complex. It severely limited the size of the construction site. Because precast is manufactured off-site and delivered to the job as needed, it was preferable over field-built options that would have required significantly more space.

“Staging was a big issue,” explains Kevin Iddings, general manager of Midwest operations for High Concrete Group. “We developed a regimented schedule that allowed us to ship the precast pieces one at a time as they were needed. It helped avoid a backlog of materials in the field.”

In addition, High worked with the architect to simplify the job as much as possible, eliminating unnecessary pieces and identifying ways to reuse molds, thereby minimizing costs.

Integration

Nestling an 18-story hotel and conference center into the historic streetscape of downtown Lancaster wouldn’t be easy, but architect Lane Chapman said she was determined to be respectful of the existing architecture while incorporating the modern amenities expected of a high-end facility.

“The goal was to minimize negative impact on the streetscape,” says Chapman. The impressive façade of the landmark C. Emlan Urban-designed Watt & Shand Department Store was preserved and restored as the new face of the hotel. Blending in with the 1898 limestone façade was paramount. The precast concrete was finished with a buff sandblast finish to complement limestone, and detailed pieces above the windows and doorways throughout the new structure echo its ornate Beaux Arts carvings.

Additionally, the adjacent Federal-style Montgomery House, designed by the architect Stephen Hills, who also designed the first Pennsylvania State Capitol building, as well as the homes of abolitionist Thaddeus Stevens and of African-American landowner Lydia Hamilton Smith were incorporated into the convention center complex.

Because precast concrete is manufactured in a controlled factory environment, the wall panels achieved a level of uniformity unmatched by poured-in-place construction. This includes consistent door and window openings, which eliminated the need for costly fieldwork to correct gaps and irregularities.
View Lancaster County Convention Center
Pinnacle_0380.jpg
Healthcare 03/04/2019

UPMC Pinnacle Health

The UPMC York health campus is home to three precast concrete enclosed buildings.  These buildings have very similar qualities to each other but stand alone. Each building has the same color scheme using a light color with a sandblasted finish and a dark charcoal color with a duxberry formliner. 

The hospital contains more individualized rooms where each window is framed with a unique precast portion that protrudes out. The elevation around the windowsill grows from a flat side to about a 3-inch elevation on the other side. This creates beautiful shadows framing the windows themselves. 

The surgery and cancer center is more of a full-floor unit. You can identify this portion by the picture frame windows that span the whole floor. These windows also have projections, but they run from top to bottom compared to the hospital windows that run left to right. 

The last building on the campus is the central utility plant. This building is home to all the HVAC and generators to support the other two buildings. With the exposed roof and design of the hospital and the surgery and cancer building, they did not want to house these items on the roof of the buildings. As a result, the facility nearby houses all that is needed to help maintaine the other two buildings. 

View UPMC Pinnacle Health