University of Pennsylvania Health Sciences Tower

  • Pennsylvania
  • Healthcare
  • Enclosure
  • Tan
  • Blast

PROJECT OVERVIEW

Pulling in the beauty of what the sun can do to a building, the designers captured the memorizing angles consistently throughout the self-cleaning, TX Active white cement mix. The primary design objective was to create a signature architectural building using precast while maintaining a strickt budget. This 10-story 36,735 square foot precast facade was designed with folded triangle faceted insulated wall panels, angled decorative fins, and a deceptive fold from top to bottom of this building. Two of the full precast sides of the building assimilate two large triangles meeting together on one of the three sides. At the seam where those sides meet, the panels either cascade in or out depending on the side you are viewing. The angled decorative fins sit vertically along the outside of windows. These three-dimensional fins rotate the angular peeks from one vertical row to the next. Building the illusion of depth and complexity on the building, this eye-catching feature cannot go unnoticed. Energy efficient faceted wall panels might seem to take a back seat in this beautiful design. With the details in depth created with the folded triangular pattern along these narrow wall panels your eye goes directly to them. This building, built with LEED silver certification contingency, was designed to withstand the future 10 floor addition. A mirrored image of the building standing now will be placed above the existing structure.

Project Details

  • Owner: University of Penn Health System
  • Architect: Perkins & Will
  • Engineer of Record: O'Donnell & Naccarato
  • General Contractor: IMC Construction
  • PCI-Certified Erector: Precast Services
  • Precast Cost: $3,100,000
  • Project Cost: $1.5 Million
  • Project Size:  300,000 ft2

Key Project Attributes

  • Due to the downtown location of the Hospital Tower, a crane was required to be used for the erection of the steel and precast. Due to the location, the timing of the piece's arrival was essential due to the space restrictions.

  • This 10-story 36,735 square foot precast facade was designed with folded triangle faceted insulated wall panels, angled decorative fins, and a deceptive fold from top to bottom of this building.

  • Utilizing BIM allowed for constant changes and real-time updates. Visuals for the owner were also beneficial.

"Utilizing BIM allowed for constant changes and real-time updates."